INSTALLATION
Barn Door Installation Steps
Step 1: Prepare the Wall & Opening
- Confirm door size, opening clearance, and wall space.
- Locate wall studs and mark mounting points.
- Ensure the wall surface is flat and level.
Step 2: Mount the Track Directly to Studs
- Align the track above the opening according to installation height requirements.
- Secure the track directly into the wall studs using the provided lag bolts.
- Use a level to ensure the track is perfectly straight.
⚠️ Do not mount the track into drywall only.
Step 3: Install Rollers on the Door
- Attach rollers and anti-jump disks to the top of the door.
- Tighten all fasteners securely.
Step 4: Hang the Door
- Lift the door and carefully set the rollers onto the track.
- Slide the door back and forth to confirm smooth operation.
Step 5: Install Floor Guide
- Position the floor guide to keep the door aligned.
- Secure it to the floor or wall as required.
Step 6: Install Door Stops & Handles
- Install track stops to limit door travel.
- Attach door handles or pulls.
Step 7: Final Adjustment & Inspection
- Make final roller adjustments if needed.
- Confirm all hardware is tight and door moves smoothly.
